583
Comment:
|
645
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
the following todo/timeline needs to be checked by Gunnar | the following todo/timeline needs to be checked by Gunnar and other locals |
Line 3: | Line 3: |
we should probably add people names to these tasks | we should probably also add people names to these tasks... |
Line 20: | Line 20: |
1. start laying cables (where? (if??)) | |
Line 25: | Line 26: |
1. aruba sets up APs (requires server room!) | 1. aruba sets up more APs |
Line 30: | Line 31: |
1. luiz from aruba leaves | 1. luiz from aruba leaves, erick stays? |
the following todo/timeline needs to be checked by Gunnar and other locals
we should probably also add people names to these tasks...
May 3rd
- uplink arrives in cafe
May 5th
- wireless bridge to Oaxtepec is build
May 6th
- server room gets used:
- switches
- central server
- aruba starts setting up APs (requires server room!)
- start laying cables (where? (if??))
May 7th
- cooling gets installed in server room
- other server get installed in the server room
- aruba sets up more APs
- wireless link to the tower is set up
May 8th
- luiz from aruba leaves, erick stays?